Erinan Building Scheme Summary

  1. Approval of Developer: Plans must be approved in writing by the developer.

  2. Minimum/Maximum size and Height.

    • Finished floor area not less than:

      • 2 storey: 185 sq meters

      • Split level: 168 sq meters

      • Single storey: 150 sq meters

    • Heights:

      • Dwelling: 9 meters

      • Ancillary structure: 4.5 meters

      • Height means the distance measured in a straight line vertically between the highest point on the highest part of the building and any point that is at e directly below that highest point, excluding any chimney, solar heating panel or like structure or thing that projects above the surface of the roof.

  3. Exterior Materials

    • No vinyl or aluminum siding.

    • Chimneys must be faced with brick or stone

    • Roofs must be shingle, slate, concrete, fiberglass, rubber, clay or similar building material.

  4. Building Siting and Landscaping

    • Except within the Building Envelope, no trees greater than 6 meters high or greater than 30 cm in diameter (measured 1.5 meters above the ground) shall be removed unless unsafe or diseased.

    • Front yards shall be landscaped with lawns, trees, shrubs and gardens with maximum 40% of front yard covered by hard surfaces. Frontage adjacent to boulevard shall be landscaped with lawn and irrigated.

    • Fences must be wood, rock, concrete, iron. No chain link unless landscape screen placed outside of its perimeter.

    • Minimum 2 car garage, attached or separate. No carports.

    • Driveways: concrete, asphalt, tile or pressed tile concrete.

    • Building Envelope: 6 meters from perimeter of house or outbuilding.

  5. Accessory Buildings and Structures and Storage of Vehicles

    • No accessory building or satellite dishes in front yard.

    • Satellite dishes must be lower than roof height of house, screened from street view and max diameter of 60cm.

    • Trailers, RVs, boats, etc must be screened from the street.

    • No pole mast, vertical antenna or similar object can be erected which may impede the view or seem unsightly to adjacent lot owners.

  6. Scheduling

    • Construction must be complete in 12 months after building permit issued.

    • Landscaping must be done within 9 months after occupancy permit issued.

    • Driveways must be finished within 9 months after occupancy permit issued.

    • Dwellings must be substantially complete on the exterior and an occupancy permit issued before they can be occupied.

  7. General Requirements

    • No lot shall subsequently be subdivided or it's boundaries altered.

    • Only single family detached dwellings, no duplexes, or bed and breakfast use permitted.

    • Secondary suites permitted.

    • Domestic household pets only.

    • No commercial business other than a home office located in the dwelling. No day care facilities, schools or any other form of institution.

    • No signs except a temporary for sale sign.

    • Properties must be kept in a state of good repair and attractive condition.

  8. Exemption: The administrator may make exemptions.

  9. Site Specific Covenants - Boulevard Protection

    • Lots 11,12,13,25,46 & 47 Only:

      • Fence heights on Erinan Boulevard max 1.2 meters high.

      • Owner must maintain said fence.

  10. Site Specific Covenants - Pedestrian Parkway Protection

    • Lots 22,23,27,28,41,42,52 & 53 Only:

      • Fence or landscape buffer must be installed adjacent to pedestrian pathway.

      • Fence or landscape buffer must be installed prior to occupancy permit being issued.

      • Owner responsible for maintaining fence or landscape buffer.

 

This is summary of the building scheme and must not be relied upon without verification.

  Copyright © 2010 erinanestates.com. All rights reserved. Created by IG Web Development